BATHROOM RENOVATION · ALTONA NORTH 3025

Bath Installation Altona North

Client wanted a bath where the shower was. We removed the existing shower, reconfigured the waste and overflow connections, and fitted the new bath. Before and after photos below — the difference is significant.

Call 0434 542 446

The Job — Shower Out, Bath In

The client in Altona North had a functional bathroom but no bath — just a shower recess that hadn't been updated in years. They were renovating the room and wanted a bath fitted in the same footprint. Our scope was all the plumbing: disconnecting the old shower waste and supply lines, modifying the rough-in to suit the bath's drain and overflow position, and fitting the bath once tiling was complete.

The before photo below shows the bathroom ahead of the renovation — the original shower configuration with the existing waste point. The after photo shows the finished bath in position, all connections made, ready for use.

Before & After

Bathroom before renovation showing old shower recess Altona North Melbourne
Before — Existing Shower
Newly installed bath in renovated bathroom Altona North Melbourne
After — Bath Installed

How the Plumbing Was Done

A bath and a shower have different plumbing requirements. A shower waste is typically a 50mm floor waste sitting flush with the tile. A bath needs a 40mm waste outlet at the base of the bath connected to a P-trap, plus an overflow fitting near the rim that ties into the same line. These positions are fixed by where the bath sits — the rough-in has to match.

In this job, the existing waste was repositioned to align with the bath waste outlet. The supply lines — hot and cold — were capped and re-routed to the bath mixer tap position. All connections were made before the bath was set down, with access panels considered for any future maintenance.

1
Existing shower disconnected and removed

Supply lines isolated and capped. Shower screen and tray removed. Existing waste fitting extracted from the floor.

2
Waste repositioned to suit bath drain location

The new bath waste outlet sits in a different position to the old shower waste. We modified the drain line to align with the bath's fixed drain position, ensuring correct fall throughout.

3
Overflow and P-trap fitted

Bath overflow assembly connected and run to the waste line. P-trap installed below floor level with correct depth for the bath waste outlet height.

4
Supply lines re-routed to mixer tap position

Hot and cold supply re-routed through the wall to the bath mixer tap position. Lines pressure-tested before tiling commenced.

5
Bath set and final connections made

Bath set into position after tiling was complete. Waste, overflow, and tap connections finalised. Bath filled and all fittings checked for leaks — none found.

Altona North — City West Water Zone

Altona North 3025 is served by City West Water. All private plumbing inside the property boundary is the homeowner's responsibility. If your renovation involves changes to supply lines or sewer connections, we can advise on what requires a permit and what falls under standard licensed plumbing work.